Lowest Price for Concrete Pump Hydraulic System - Delivery Pipe – ANCHOR
Lowest Price for Concrete Pump Hydraulic System - Delivery Pipe – ANCHOR Detail:
|
Part number |
Type |
Thickness (mm) |
Length (mm) |
Weld-on ends |
Applicable pump |
Brands material |
|
SJT-1 |
DN125 (5″) |
4.0 |
3000 2000 1000 |
SK-148mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
ST52 ST37 20# Q235 |
|
SJT-2 |
DN125 (5″) |
4.5 |
SK-148mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
|
SJT-3 |
DN125 (5″) |
7.1 |
SK-148mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
|
SJT-4 |
DN125 (5″) |
4.0 |
Schwing F/M |
Schwing |
||
|
SJT-5 |
DN125 (5″) |
4.5 |
Schwing F/M |
Schwing |
||
|
SJT-6 |
DN125 (5″) |
7.1 |
Schwing F/M |
Schwing |
||
|
SJT-7 |
DN125 (5″) |
7.1 |
ZX-F/M |
Putzmeister |
||
|
SJT-8 |
DN100 (4″) |
4.0 |
122mm/ 127mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
|
SJT-9 |
DN100 (4″) |
4.5 |
122mm/ 127mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
|
SJT-10 |
DN100 (4″) |
6.0 |
122mm/ 127mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
|
SJT-11 |
DN80 (3″) |
4.0 |
98mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
|
SJT-12 |
DN80 (3″) |
4.5 |
98mm |
Schwing, Putzmeister CIFA Kyokuto |
||
|
SJT-13 |
DN150 (6″) |
8.0 |
ZX-F/M |
Putzmeister |
||
|
SJT-14 |
DN150 (6″) |
8.0 |
3000 2000 1000 |
6HD |
Schwing, Putzmeister CIFA |
|
|
SJT-15 |
DN125 (5.5″) |
4.5 |
5HD |
Schwing, Putzmeister CIFA |
||
|
SJT-16 |
DN100 (4″) |
4.0 |
4HD |
Schwing, Putzmeister CIFA |
||
|
SJT-17 |
DN80 (3″) |
4.0 |
3HD |
Schwing, Putzmeister CIFA |
||
|
SJT-18 |
DN125 (5.5″) |
6.5 |
Sany- 157mm |
Sany |
||
|
SJT-19 |
DN125 (5.5″) |
6.5 |
ZoomlionF/ M-175mm |
Zoomlion |
||
|
SJT-20 |
We can also produce the special concrete pump delivery pipes, 2″-8″,length 500mm-6000mm,thickness:3mm-15mm, or according to the customer’s specific requirements. |
|||||
The product is made of the special material steel tubes,after quenching inside it.Carburizing chemical treatmeat,Flange sleeving,Its hardness reaches 58-62 degrees.The life of pipeline increases 3-5 time.So that can make users save time,Coat and the trouble of changing tubes and improve production efficiency.
SRUCTURE
|
Name |
Structure |
HRC |
Thickness mm |
Structure Sketch Map |
|
Base Material |
Pearlite & Ferrite |
23 |
2.5 |
Abrasionresist layer/ Crackresist layer |
Life Comparison & Quality
|
Name |
Material |
Structure |
Characteristic |
Life (squre) |
life (squre) |
|
Normal |
20 |
Monolayer |
Low cost,rapid abrasion,short life |
7000-8000 |
|
|
High Quality |
Alloysteel |
Monolayer |
High cost,long life |
20000-25000 |
|
|
Hardening (doublelayer) |
Alloysteel |
Double |
Higher cost with abrasion resist wall and crack resist ektexine.4-5 times longer life |
38000-45000 |
Product detail pictures:
Related Product Guide:
We pursue the administration tenet of "Quality is exceptional, Provider is supreme, Name is first", and will sincerely create and share success with all clientele for Lowest Price for Concrete Pump Hydraulic System - Delivery Pipe – ANCHOR , The product will supply to all over the world, such as: moldova , Riyadh , French , We believe in establishing healthy customer relationships and positive interaction for business. Close cooperation with our customers has helped us to create strong supply chains and reap benefits. Our products have gained us widespread acceptance and the satisfaction of our worldwide valued clients.
By Sarah
from Atlanta
- 2017.02.14 13:19
Although we are a small company, we are also respected. Reliable quality, sincere service and good credit, we are honored to be able to work with you!
By Joyce
from United States
- 2018.12.30 10:21











